Home / Industries /Energy

Industry

Energy

High conductor loads, electrical continuity requirements and area classification.

Energy

What does ATN solve in energy?

Cable runs grow in stages and change route. The support system has to allow that growth without redoing the route.

Cable runs grow in stages and change route. The support system has to allow that growth without redoing the route.

Cable runs grow in stages and change route. The support system has to allow that growth without redoing the route.

Cable runs grow in stages and change route. The support system has to allow that growth without redoing the route.

Recommended products

Most specified in energy

See full catalog →

TRFP-04-P314L-Z-AL

Straight Section Perforated Bottom

Width 4" · Depth 3 1/4" light

Aluminum

See data sheet →

CHE-04-P314L-R08-45-Z-LAL

Horizontal Bend Ladder Type

Width 4" · Radius 8" · Depth 3 1/4" light

Aluminum

See data sheet →

MUDBC-4-GE

Bracket Channel Dual Channel Based

Size 4"

2 finishes available

See data sheet →
Applicable solutions

Common problems in the sector

Solution

Main plant route

An electrical backbone that has to grow without redoing the existing installation.

See solutions →

SUCCESS STORIES · 12 PROJECTS

ATN solutions at work in major projects

1 of 12

Swipe to see more projects

Do you work in energy?

Tell us the conditions of your installation and we will help you specify the system.

Request advice