Home / Solutions /Main plant route

Main plant route

Problem

An electrical backbone that has to grow without redoing the existing installation.

Solution

Deep ladder-type system with splice plates and 30% spare capacity.

Result

Future expansions without replacing sections already installed.

Industries where it applies:

ManufacturingEnergy
Recommended products

Parts that solve this case

See full catalog →

TR-04-06-P314L-Z-LAL

Cable Tray Ladder Type

Width 4" · Depth 3 1/4" light

Aluminum

See data sheet →

CHE-04-P314L-R08-45-Z-LAL

Horizontal Bend Ladder Type

Width 4" · Radius 8" · Depth 3 1/4" light

Aluminum

See data sheet →

MUDBC-4-GE

Bracket Channel Dual Channel Based

Size 4"

2 finishes available

See data sheet →
ATN del Norte sales support

Facing this problem?

An advisor can check the solution against the real conditions of your installation.

I want more information